Engineering and financial supervision of highway

Engineering and financial supervision of highway Construction of Zagreb – Split Highway section from Jezerane to Ličko Lešće with all supporting facilities. On the route there are two tunnels (Plasina and Brinje) that are named thesafest European tunnels by EuroTAP. GI provided engineering and financial supervision services. Highway Zagreb – Split is 387,34 km long […]

Procurement and Contract administration

Procurement and Contract administration Procurement & Contract Administration for container Terminal Brajdica-Rijeka Container Terminal Brajdica pier extension project (328m new pier / 101.000m2warehouses). GI prepared the Tender documents and assisted in the procurement process, which was done according to the World Bank rules. GI acted as the FIDIC Engineer (red book) and provided supervisory servics. […]

Supervision in repair of waste landfill

The remediation project contributes to the objectives of the Operational Programme ‘Environment protection’ 2007 to 2013 as it will repair unarranged landfills and improve the condition of groundwater and surface water, human health and the environment as a whole. The primary goal of rehabilitating the dumpsite was the prevention of pollution of the aquifer and […]

Denivelation crossing the state road

Denivelation crossing the state road The goal of this project was to increase the safety of all road users and traffic flow displacement state road D8 and county road ŽC6039, construction intersection markings: A (a four), B (three-spoke), C (roundtrip), D (three-spoke), F (three-spoke ) along the state road D8 and the construction of the […]

FIDIC Engineer Supervision

FIDIC Engineer Supervision GI provided technical and financial supervision, FIDIC Engineer and Coordinator for occupational safety and health over Vodice bypass construction works according to the FIDIC Red Book. FIDIC Engineer Supervision for Vodice bypass ring. The goal of Vodice bypass project was traffic reduction in Vodice city, especially during the summer season, thereby achieving […]

Engineering supervision of gas pipeline

Engineering supervision of gas pipeline New high pressure gas pipeline from Bjelovar to Sveti Ivan Žabno was built to ensure enough gas quantity to existing pipeline users. The project task was to build new high pressure gas pipeline from Bjelovar to Sveti Ivan Žabno (area of Rovišće, Kadinac, Sv. Ivan Žabno, Vrbovca, Hagnja i Križevaca). […]

Technical consulting in sanation of waste landfill

Professional supervision and technical consulting in sanation of waste landfill Jakuševec is Zagreb’s municipal and other waste landfill and is one of the highest and largest landfills in Europe. Location of the landfill at a distance of 400 m from nearest settlement houses and about 6 km from the Zagreb city center gives great engineering […]

Reconstruction of bridges

Reconstruction of bridges German Government donated funds for the rehabilitation of the two destroyed bridges over Neretva river in Bosnia and Herzegovina, which were destroyed in war. In order to put in in working order the railway line Ploče – Sarajevo and again establish communication with , i.e. BiH with Croatian port Ploče, German Government […]

Health and safety coordinator

Health and safety coordinator GI provided technical supervision services and health and safety coordinator services for rehabilitation works for State Road D20 in lenth of 5,0 km, section Sv. Križ-Prelog. Section of State Road D20 is in Medjimurje County and is the main connection for towns  Sv.Križ and Prelog. In accordance with the character of […]

Construction of border crossing

Construction of border crossing Construction of border crossing Metković is a part of Croatian preparation for joining the Schengen area. Investinženjering d.o.o. provided construction supervision, FIDIC engineer consulting services and supervision of implementation of Environmental and Social Action Plan and consulting services on construction of border crossing Metković. Construction of border crossing was financed by […]