Road bypass installation relocation GI provided technical supervision services for installation relocation and protection works (water, electricity, TK installations, gas) and road equipment. Velika Gorica bypass in lengh of 6.5 km was built in two phases. Second phase in length of 5.4 km has five crossroads including the one with the lane for the new […]
Supervision of works on wind farm When finished will be the largest wondfarm in Croatia. GI is providing technical supervision of electro, geodetic, mechanical and geotechnical works and health and safety coordinator services. Wind farm Obrovac of 42 MW installed power altogether with connecting high voltage cable 110 kV TS Obrovac – TS Zelengrad and […]
Financial Supervision Financial Supervision Water Supply System and Sewerage System in Slavonski Brod supervision of the construction according to the FIDIC Red Book. Supervision of construction of the Water Supply and Sewerage System with Waste Water Treatment Plant for the town of Slavonski Brod. The construction of Water Supply System and Sewerage System in Slavonski […]
Train station construction supervision New train station Karlovac Center is situated across main bus station in downtown city of Karlovac. It is a complex platform construction which is supported with columns and it is the only of that type built in Croatia. Platform is 160 meters in length and 4,5 meters wide. It consist of […]
Engineering and Financial Supervision GI carried out the supervision of construction of the highway section from Zagvozd to Ravča and all supporting facilities. On the route there are two viaducts Dubrava 260 m and Rašćane 633 m. Viaduct Rašćane was very interesting because it is constructed by „pushing and breaking“ technology. In the period of […]
Engineering supervision of construction works Brinje tunnel is located on Zagreb – Split Motorway at 590 m a.s.l. In 2007 it was declared the best tunnel in Europe by EuroTAP. Brinje tunnel is located at 123 rd km of Zagreb – Split – Dubrovnik Highway at 495 m above sea level. Brinje Tunnel has two […]
Engineering supervision services Rehabilitation of national roads D-6 (Topusko – Glina), D-28 (Bjelovar – Patkovac), D-102 (Njivice – Treskavac). The activities for rehabilitation of pavements of national roads in the Republic of Croatia include the rehabilitation of the section of the roads D- 6 Section from Topusko to Glina, D-28 section from Bjelovar to Patkovac, […]
Engineering Supervision Reconstruction of Škorpikova street project brought into better operation one of the main commercial streets in the western part of Zagreb. Phase I consisted of enlargement of the street Škorpikova Samoborska road to the roundabout and upgrade of Škorpikova Samoborske to the underpasses. Works in this phase included the construction of a new […]
Engineering Supervision of Works Engineering Supervision of Works on Construction crossing of Slavonska Avenue – Ljudevita Posavskog Street. Construction of nearby settlement Sopnica – Jelkovec caused additional congestion of an already quite busy intersection. A better regulation and circulation of traffic was achieved with reconstruction of intersection between Slavonska Avenue and Ljudevit Posavski Street. Reconstruction […]
Engineering supervision on construction of the bridge GI performed engineering supervision of works on construction of the bridge over Gacka river on Zagreb – Split Highway (Žuta Lokva – Otočac Section). The Gacka bridge consists of two parts: bridge and viaduct, of 452 m total length. Bridge structure: encased structure over Gacka channel, continuous bearing […]