Reconstruction of bridges German Government donated funds for the rehabilitation of the two destroyed bridges over Neretva river in Bosnia and Herzegovina, which were destroyed in war. In order to put in in working order the railway line Ploče – Sarajevo and again establish communication with , i.e. BiH with Croatian port Ploče, German Government […]
Commercial buildings
Health and safety coordinator GI provided technical supervision services and health and safety coordinator services for rehabilitation works for State Road D20 in lenth of 5,0 km, section Sv. Križ-Prelog. Section of State Road D20 is in Medjimurje County and is the main connection for towns Sv.Križ and Prelog. In accordance with the character of […]
Construction of border crossing Construction of border crossing Metković is a part of Croatian preparation for joining the Schengen area. Investinženjering d.o.o. provided construction supervision, FIDIC engineer consulting services and supervision of implementation of Environmental and Social Action Plan and consulting services on construction of border crossing Metković. Construction of border crossing was financed by […]
Road bypass installation relocation GI provided technical supervision services for installation relocation and protection works (water, electricity, TK installations, gas) and road equipment. Velika Gorica bypass in lengh of 6.5 km was built in two phases. Second phase in length of 5.4 km has five crossroads including the one with the lane for the new […]
Supervision of works on wind farm When finished will be the largest wondfarm in Croatia. GI is providing technical supervision of electro, geodetic, mechanical and geotechnical works and health and safety coordinator services. Wind farm Obrovac of 42 MW installed power altogether with connecting high voltage cable 110 kV TS Obrovac – TS Zelengrad and […]
Financial Supervision Financial Supervision Water Supply System and Sewerage System in Slavonski Brod supervision of the construction according to the FIDIC Red Book. Supervision of construction of the Water Supply and Sewerage System with Waste Water Treatment Plant for the town of Slavonski Brod. The construction of Water Supply System and Sewerage System in Slavonski […]
Train station construction supervision New train station Karlovac Center is situated across main bus station in downtown city of Karlovac. It is a complex platform construction which is supported with columns and it is the only of that type built in Croatia. Platform is 160 meters in length and 4,5 meters wide. It consist of […]
Engineering and Financial Supervision GI carried out the supervision of construction of the highway section from Zagvozd to Ravča and all supporting facilities. On the route there are two viaducts Dubrava 260 m and Rašćane 633 m. Viaduct Rašćane was very interesting because it is constructed by „pushing and breaking“ technology. In the period of […]
Engineering supervision of construction works Brinje tunnel is located on Zagreb – Split Motorway at 590 m a.s.l. In 2007 it was declared the best tunnel in Europe by EuroTAP. Brinje tunnel is located at 123 rd km of Zagreb – Split – Dubrovnik Highway at 495 m above sea level. Brinje Tunnel has two […]