Highway engineering supervision

Highway engineering supervision Engineering supervision of works on the construction of Zagreb – Sisak Highway, section Velika Gorica (south) – Buševec, including 2 toll station, 5 bridges and 4 overpasses. Zagreb – Sisak Highway consists of sections Jakuševec – Velika Gorica (south), Velika Gorica (south) – Lekenik, Lekenik – Sisak in complete highway width. The […]

Rehabilitation of National Roads

Rehabilitation of National Roads GI acts as FIDIC engineer and provides supervision services on three sections of the national roads: Road D1 (Knin- Biskupija and Pađene – St. Straža) and Road D50 (Intersection Sv.Rok – Gračac), in the total length of 32,2 km. Rehabilitation of mentioned sections other than road works (phase B / group […]

Reconstruction of Road Bridge

Reconstruction of Road Bridge Engineering Supervision of Works on reconstruction of the bridge over river Glina in the town of Glina on the State road D6. Structure of the ‘Glina’ bridge is a braced structure consisting of steel bearing elements and reinforced concrete slab. Main bearing elements are placed in line, vertical curve is obtained […]

Financial supervision

Financial supervision GI has performed a complete technical and financial supervision of the rehabilitation of tunnel Žutnica. Road tunnel is in traffic since 1970, and had no drainage system. Žutnica tunnel has a length of 215 m¹. The existing tunnel lining, which served as the primary tunnel support, hydro insulation has been added and built […]

Engineering supervision for sewage system

Engineering supervision for sewage system Engineering supervision of works on sewage-system Duga Resa – Karlovac in the total length of 10.500m. The outlet is temporarily made to river Kupa until the construction of sewerage treatment plant construction. Works on sewer were executed in phases. Part of sewer in Mrzlo polje was constructed in period before […]

Engineering supervision of wastewater treatment plant

Engineering supervision of wastewater treatment plant Construction of wastewater treatment plant in Slavonski Brod, which has capacity of 80,000 PE, was financed through EU IPA program for the Republic of Croatia. The final capacity of the wastewater treatment plant (WWTP), in accordance with the already adopted planning and design documents is 80.000 PE with primary, […]

Engineering supervision of urban water supply system

Engineering supervision of urban water supply system The construction of urban water supply system includes construction of town of Bjelovar city’s distribution network and construction of alternative route junction Kupinovac, circuit water tank with the city’s water supply network. The main project feature is the Construction of the water supply piping network for town Bjelovar, […]

Article about container terminal construction

Article about container terminal construction 9.12.2015. GI Group provides both FIDIC and professional supervision at the construction of a container terminal „Zagrebačka obala“  (eng. Zagreb pier) in the port of Rijeka.   “Zagrebačka obala“  is Croatian government strategic project worth 300 million euros, which is provoking the attention and interest of both experts and  the general public. […]