Project management and construction management on reconstruction of industrial facility into 2.000m2 headquarters of ZEPTER company in Croatia. On this project GI provided project management and construction management services.

The scope of works included construction and finishing works, installations and equipment supply for completed project.

In the ground floor, next to the entrance for clients and employees, there are training facilities and reception desk for clients and consultants. Offices are on three upper floors, the management premises and conference room are at the fourth floor. In entrance premises of the ground floor there are show cabinets displaying the company products. Floors of the main staircase are made of polished granite, floors of management premises and clients’ premises are of beech tree varnished with polyurethane varnish. At office floors all floors in premises and corridors are covered with antistatic carpets.

The project is equipped with very efficient heating and cooling coo-generating plant placed on the roof elevation. Plant consists of cooler – heat pump, which is supplied with electricity from the electrical network or from gas run generators, depending on the available energy source. The heating and cooling network is a two pipe system of convectors with local temperature regulation in premises.

COMMERCIAL, OFFICE & COMPLEX BUILDINGS

Project management and construction management

  • SERVICES RENDERED

    Project management, construction management

  • PROJECT SIZE

    2.000 m2

  • PROJECT VALUE

    2.000.000 €

  • PROJECT PERIOD

    1999

  • INVESTOR

    Zepter d.o.o.

     

  Grge Tuškana 41
  10000 Zagreb
  Croatia
    + 385 1 455 11 44
    + 385 1 455 10 12
    gin@gin.hr
  