Infrastructure project airport access road
-
Services rendered
Supervision
-
Project value
38 mil. kn
-
Project period
2015 – 2017
-
Investor
Hrvatske ceste d.d.
GI took a complete supervision role (civil, mechanical, electrotechnical and geotehnical) over Zagreb airport access road build-up.
The access road project from Velika Gorica ring road to the International Airport Franjo Tudjman in Zagreb is completed. The project enabled a quality traffic-technical connection from Zagreb Airport to the main street network of the city of Zagreb and Velika Gorica. By joining the eastern ring road of Velika Gorica, which is the connection of the motorway A11 (Zagreb – Sisak) and the A3 (Zagreb Bypass) over Domovinski Bridge with the city center, the main road becomes the main access road to the aerodrome.
The project was realized within 15 months according to the FIDIC contract (Red Book) and included the construction of a 2km two-laned high-speed road with a semaphorized intersection in level including road facilities such as the Kosnica culvert, the pumping station and the noise protection wall.