Engineering supervision of urban water supply system

The construction of urban water supply system includes construction of town of Bjelovar city’s distribution network and construction of alternative route junction Kupinovac, circuit water tank with the city’s water supply network.

The main project feature is the Construction of the water supply piping network for town Bjelovar, a part of which forms a ring that ensures significant water supply of the peripheral areas of the town of Bjelovar.

The pipeline is made of ductile iron pipe profile DN 100-600. Total length of built pipeline is approximately 50 kilometers.

INFRASTRUCTURE

Water Supply System for Bjelovar

  • SERVICES RENDERED Engineering Supervision
  • PROJECT SIZE 50 km
  • PROJECT VALUE 5,5 mil.€
  • PROJECT PERIOD 1999 – 2003
  • INVESTOR Croatian Water Authority

 

     