Engineering supervision of construction works
Brinje tunnel is located on Zagreb – Split Motorway at 590 m a.s.l. In 2007 it was declared the best tunnel in Europe by EuroTAP.
Brinje tunnel is located at 123 rd km of Zagreb – Split – Dubrovnik Highway at 495 m above sea level. Brinje Tunnel has two tunnel tubes, with two lane each, 3 passenger sidewalk, and one enlarged trafic areas. It is furnished by the best quality tunnel performances and accesories ( ventilation water suply, fireprotection systems, video, electricityt, elekomunication possibilities, etc… ..) It was completed in 12 months, average daily progress 5,5 m. Specific feture of tunnel Brinje construction is application of micro-reinforced jet cocrete for the primary excavation insurance for the first time in Croatia.
2007 Brinje Tunnel was declared The Best Tunnel in Europe by EuroTAP.
On this project GI (Investinženjering d.o.o.) provided engineering supervision services.
INFRASTRUCTURE
Brinje tunnel (Zagreb – Split Highway)
- SERVICES RENDERED Engineering Supervision
- PROJECT SIZE 1.540 m’ each pipe (2 pipe tunnel)
- PROJECT VALUE 276 mil.kn
- PROJECT PERIOD 2002 – 2004
- INVESTOR HAC (Croatian Motorway Authority) Ltd.