Engineering supervision tunnel furnishing

previous arrow
next arrow
Slider
Completing and furnishing of the left hand side of the tunnels Mala Kapela and Sveti Rok in order to ensure full profile of highway.

In addition to furnishing works, there was also need for COKP Sveti Rok – mid-way connector chambers works , upgrade of Fire Department building on the south tunnel Sveti Rok and works to build a new transformer station supply unit KBDV 35 kV 110/35 kV GRAČAC – TS 35/20 kV Sveti Rok Tunnel (North). Works to the tunnel Mala Kapela and Sveti Rok included ventilation system, fire alarm and Fire hydrant network, tunnel lighting, LV power supply, spare power supply, separators for tunnel approach road tunnel lighting, sewer cable, fiber optic cable, TPS system, sound systems, radio system, video-data system, remote control of traffic and traffic-technical part. Upgrade of Sveti Rok – on the plateau COKP e-Sveti Rok to build additional building (building control traffic).

Reconstruction and upgrade of Fire Department building on the south tunnel Sveti Rok – the object is intended to accommodate Fire Department and other traffic control tube tunnel. KBDV 35 kV – New TS 35/20 kV Sveti Rok Tunnel (north) will be incorporated in the construction of a new electricity network KBDV 35 kV 110/35 kV GRAČAC – TS 35/20 kV Sveti Rok Tunnel (North) in length from approx. 22 km. With the subject lay electricity cable and optical cable for the realization of optical connections between the 110/35 kV Gracac and TS 35/20 kV Sveti Rok Tunnel (north).

INFRASTRUCTURE

Sveti Rok and Mala Kapela Tunnels Furnishing

  • SERVICES RENDEREDEngineering Supervision
  • PROJECT SIZETunnel Sveti Rok: 5.679m; Tunnel Mala Kapela: 5.780m
  • PROJECT VALUE53 mil.€
  • PROJECT PERIOD2008 – 2009
  • INVESTORCroatian Highways Authority

     

  Grge Tuškana 41
  10000 Zagreb
  Croatia
    + 385 1 455 11 44
    + 385 1 455 10 12
    gin@gin.hr
  
TOP